June 2010 - Marco and I are ready to place the bolt.

First step...

Here, The Cota Observatory will take place.

July 2010 - Formworks.

July 2010 - The cement arrived.

Work...

..and work...

Cement is perfectly level and takes a couple of weeks off. It is time to get images with the usual mobile setup.

July 2010 - Control office-box building.

Next step...

...et voila, the control box is done. In the meantime, the dome kit arrived.

August 2010 - The groud is leveled and the base ring assembled.

After several tribulations with assembly, the dome takes place.

September 2010 - Everything is ready to start a long job with wires and device controls.

January 2011 - Latest step. Te Cota Observatory is ready to start remote imaging.